Yarra River Trail

From Boroondara BUG

Jump to: navigation, search
BBUG

News

Rides

Maps and Routes

Our Successes

Campaigns

Our Council

Bicycle Information

About BBUG

Affiliates

Useful Links


The Stonnington Pages

The Whitehorse Pages

Yarra Trail

The Yarra Trail starts at Southbank and follows the river upstream. It enters Boroondara at the Fairfield pipebridge and leaves at Burke Rd, where it continues to Westerfolds Park.

Currently there is a large grade difference between the Fairfield pipebridge crossing the Yarra River and Chandler Hwy, as the trail is routed via a high point on Yarra Boulevard - green colored route. The route needs to be ironed out by removing the ascent to Yarra Boulevard - refer to mauve colored route. A substantial staircase at Chandler Hwy also has to be negotiated. The staircase needs to be eliminated. Refer to pdf diagram for suggested new routes.

BBUG have campaigned to have these problems rectified. You can also help! Have your say. Download, print, complete and mail the Letter to campaign State government for funding its completion. Letter may need to be modified to suit the current political leadership - the wheels turn slowly. Join the hundreds whom have already joined our efforts.

Until an underpass is installed under Chandler Hwy, it would be benefical if the Yarra Trail shared path led directly to the nearby pedestrian crossing on each side - it's extremely unclear where the path runs presently. The crossing electronics should be altered so that the pedestrian buttons stop both lanes of traffic simultaneously, as opposed to one lane of traffic at a time, as they are currently set to do. The pedestrain crossing is rarely used due to these failings, which is unfortunate.

Another item that needs attention is the surface of the pipebridge, which is slippery in wet weather. The bridge is narrow and this adds to the risk of a crash.

Chandler 1.jpg Chandler 2.jpg

Oct 2010

The first designs for a new Chandler Hwy bridge appear out of VicRoads. No mention of any underpasses for the Yarra Trail.

Preston Leader - 15 Oct 2010 - RELIEF may be in sight

You can read BBUG's response to the Chandler Highway proposals. We prefer Options 4 and 2 ie a new four lane bridge either on the east or west side of the existing bridge. We believe the following is essential to make good use of the existing bridge into the future:

  • a pedestrian/cyclist underpass for the Yarra Trail at Chandler Highway and a link to the pedestrian/cycle bridge
  • the Aniversary Trail be extended to Fairfield Station
  • a shared path running under the bridge on the north side, linking the pedestrian/cyclist bridge to both Coate Park and Alphington Park
  • paths to be suitable for cyclists utilizing the lowest gradients possible, with minimal changes in elevation along the path. 3m wide minimum with appropriate shy zones. No staircases.

May 2010

The Chandler Hwy crossing and nearby intersections are fast bubbling up towards the top of the list of the most congested locations in Melbourne that need fixing. Will 2011 see work begin on a new crossing of the Yarra River, complete with a river crossing for cyclists and an underpass of the Chandler Hwy for cyclists?

Northcote Leader - 14 April 2010 - Chandler Hwy bridge jams to go

Northcote Leader - 20 Jan 2010 - Amcor Site

Nov 09

It's likely VicRoads is developing plans to duplicate the bridge crossing at Chandler Hwy - a RACV red spot. Consequently it seems unlikely any underpass will be put in place, until the bridge is duplicated. In the interim there is still no reason why the trail colored in mauve cannot be sealed. This would be a useful improvement that would be of immediate use.

Oct 08

$50,000, in funding for the design of a Yarra Boulevard trail realignment announced.

Jan 08

It has been suggested that the new route may utilise a tunnel under Chandler highway. It would be close to the same level as the top of the stairs and meet up with the existing ramp on the east side of Chandler Highway. See the yellow line on map above. The stairs could be eliminated completely and returned to parkland.

It is rumoured that the one remaining pipe on the pipebridge is no longer in use or required. Removing the pipe from the bridge and rebuilding the decking would be a major improvement to this asset.

June 06

Yarra Bend Trust have appointed designers and stakeholders were invited to view initial concepts for feedback. The draft looks good and will make the Yarra Trail a far more rideable trail not only for the hundreds of daily commuters but also the recreational riders who use it on the weekend.

Feedback indicates that this link could be started within 12 months, greatly helped by recent funding increases for bike facilities from State Government.

April 06

A very successful day for BBUG saw us out at the Chandler steps at 9am and quickly running out of letters to sign! Feedback was overwhelmingly positive (if not short of breath!) with almost everyone we could speak to as hundreds of cyclists flowed past signing up to support BBUG's efforts to see the Chandler riverpath completed.

Sunday 20 March 06 BBUG to campaign for Chandler/Riverpath link completion - refer to pdf diagram here.

Whilst this vital link to the Yarra Trail has been approved by government for many years, sadly it has not attracted the funding necessary to actually complete it.

Photos